• Creation of new reception areas under the entrance hall
• Reconstruction of a new 35 metre high backdrop
• Removal and reinstallation of the metal frame and stage machinery
• Comprehensive stripping of the balconies to prepare refurbishment of their structure and installation of fire protection systems
Ministry of Culture and Communication - EMOC
Alain-Charles PERROT- Chief Architect of Historic Monuments
2003 - 2005
8 February 2016
Heritage